industrial
Process Piping Advisory
Process, equipment and materials reviewed by someone who has built it.
Yeti reviews the problem, the drawings or the bids and writes down what is needed, what it should cost, and what to ask the contractor. The pipe does not get a vote; the invoice does not either.
Planning fee
Typical range $1,500–$12,000 per process project. What moves the number:
- System size and number of media
- Site access and shutdown windows
- Documentation needs
- Oversight visits during installation
What you leave with
- A written finding, not a sales pitch
- A fair-price range for Central Texas
- Questions to take back to the installer you choose
Calm waterClear scopeIndependent advice
Get clear answers before you spend
Tell us about the problem, project or bid. A consultant replies within one business day with next steps and a fixed fee.